Soho Loft 405 (DA)
Soho Loft 405 project was performed in second part of 2011, during the practice semester in C-Studio company. It is a conversion of edifice industrial compartment into the residential loft, which consists of two storeys.
Edifice creation process has passed through the concept design and development application phases (different countries has different terms for phases) and consists of model and drafts.
ArchiCAD 15 was used for drafting and modeling, 3Ds Max 2010 + V-ray for model production and Photoshop CS5 for model post-production.
For other Edifice (2011) projects, link to the Edifice (2011) category.
Advertisements