Cronulla House (CC)

Cronulla House project was performed in first part of 2012, during the exchange to the sustainable building design advanced diploma course of Sydney TAFE institute of technology. It is a residential edifice, consists of two storeys and a basement.

Edifice creation process has passed through the concept design, development application and construction certificate phases and consists of brief report, site analysis, schematic design, model, drafts, sustainability analysis, post-production,  photo-montage and reports.

Revit Architecture 2012 was used for drafting and modeling, Ecotect 2011 for sustainability analysis and Photoshop CS5 for brief report, site analysis, schematic design, post-production, photo-montage and reports.

For other Edifice (2012) projects, link to the Edifice (2012) category.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: